The project implemented:
- Development of design and detailed documentation
- Production and complete supply of equipment
Scope of supply:
Complete supply of process equipment
- Waste preparation unit
- Waste loading unit (automated loading)
- Thermal treatment and disposal unit
- Flue gas cooling unit with heat recovery
- Off-gas treatment and cleaning unit
- Control unit
- Valves, piping and interconnecting parts
- Spare parts, tools and accessories
- Operating documentation set
The unit is implemented as part of the construction of a new enterprise in Bashkiria for the production of a cetane improver additive for diesel fuels.
The plant’s design capacity is 30 thousand tons per year. This is the first Russian plant specializing exclusively in the production of cetane improver additives for oil refining enterprises.
Production start-up is scheduled for 2025.
Scope of supply:
- Technology development
- Development of working design documentation
- Manufacturing and complete supply of equipment
- Supervision of installation works
- Commissioning works
Implementation of an evaporation and crystallization unit for salt concentrate with subsequent dewatering in order to minimize and utilize salt sludge.
Within the framework of the project, the following were supplied: tank, filtration, and heat-exchange equipment, pumps, decanter, evaporator, salt column, heating chamber, cooling towers, centrifuges, ejectors, and shut-off and control valves.
Scope of supply:
- Process design
- Development of RDD
- Manufacturing and supply of equipment
- Supervision and commissioning works
- Personnel training
The Baikal Pulp and Paper Mill operated from 1966 to 2013. It was the city-forming enterprise of the single-industry town of Baikalsk. The plants supplied by LLC "ZAVKOM-ENGINEERING" are part of a station for treating alkali-containing effluents with a capacity of 2,000 m³/day. Infrastructure for the purification and removal of supernatant waters at the Solzansky site is being created within the framework of the federal project for the remediation of accumulated environmental damage caused by the Baikal Pulp and Paper Mill.
Supply and installation
Scope of supply:
- Process design
- Development of detailed design documentation (RDD)
- Manufacturing and supply of equipment
- Installation and supervision of installation works
- Commissioning works
- Personnel training
Scope of supply:
The reverse osmosis concentrate polishing unit is located in a prefabricated building, common for three lines, and includes:
- Reagent softening unit for concentrate;
- Mechanical dewatering unit for sludge No. 3;
- Evaporation unit:
- First stage – evaporation with production of a concentrated product in the form of a liquid salt concentrate;
- Second stage – further evaporation of the salt concentrate from the first stage to obtain a salt suspension;
- Third stage – centrifugation (separation of crystalline salts from the liquid phase, obtaining waste with moisture content up to 40%).
Scope of supply:
- Pre-project surveys
- Development of basic and detailed engineering
- Process and general design
- Development and implementation of APCS (Automated Process Control System)
- Supply of process equipment
- Supervision of installation works
- Commissioning works
The complete filtration unit is supplied to the Omsk Refinery within the framework of the project to reduce the concentration of harmful substances in the plant’s industrial wastewater.
Thanks to multi-stage treatment, the efficiency of wastewater purification at the Omsk Refinery will increase to 99.9%.
Scope of supply:
- Complete supply of equipment
- Commissioning works
Scope of supply:
- Design documentation
- Working documentation (material balance recalculation and import chemical replacement)
- Manufacture and supply of process equipment
- Process control system development
- Control cabinets, power cabinets and software
- Installation supervision
- Commissioning
Unit model
Scope of supply:
- Basic engineering
- Detailed engineering
- Installation supervision
- Commissioning
Unit model
Currently, equipment is being manufactured, power and control cabinets are being assembled within the framework of a project with JSC "Ion exchange technologies" for JSC "Gazpromneft ONPZ".
Within the framework of this project, implemented / planned:
- the technology,
- working design documentation was developed,
- the equipment was completed,
- the equipment was manufactured and supplied,
- installation supervision and commissioning were carried out.