Implementation Evaporation plant LLC "NPO Ecosystem" Moscow Region Evaporation plant LLC "NPO Ecosystem" Moscow Region Implementation Scope of supply: Supply of equipment To get a consultation
Implementation Filtration equipment within the modernization of the catalytic cracking gas regeneration-cleaning unit JSC «Gazpromneft-ONPZ» Omsk Region Filtration equipment within the modernization of the catalytic cracking gas regeneration-cleaning unit JSC «Gazpromneft-ONPZ» Omsk Region Implementation As part of the modernization project for Production No. 2.43-103 (catalytic cracking gas regeneration cleaning unit), filtration equipment was supplied and installed. Scope of supply: Development of working design documentation; Supply of equipment: Filter press Compressor Tank with mixing device Gas receiver Pumps Set of control and shut-off valves Centrifuge Supervision of installation works; Commissioning works; Personnel training. To get a consultation
Implementation Acetone regeneration plants by rectification method LLC «SAMSON-MED» Leningrad Region Acetone regeneration plants by rectification method LLC «SAMSON-MED» Leningrad Region Implementation Scope of supply: Technology development Development of design documentation Equipment procurement Manufacturing and supply of equipment Supervision of installation works Commissioning works To get a consultation
Completed Installation of resin production LLC «Schattdecor» Moscow Installation of resin production LLC «Schattdecor» Moscow Completed At the current time, commissioning works are being carried out. The projected unit is intended for the production of urea-formaldehyde resin (PKFT) and melamine-formaldehyde resin (MPST) with a total capacity of up to 42,240 tons per year. Within the framework of this project, implemented / planned - the design and working documentation was developed, the equipment was completed, the manufacture and supply of equipment, installation supervision and commissioning were carried out. To get a consultation