Projects in 2017 — Reference list petrochemistry
Оборудование для установки ректификации и вакуум-выпарной установки.
The project implemented:
- General design
- Complete supply of equipment
- Commissioning work
- Construction and installation work
The project has been implemented.
Scope of supply:
- Design and estimate documentation
The absorption refrigeration machine was put into commercial operation in 2017.
The company 000 "ZAVKOM-ENGINEERING" in 2017 successfully carried out work on the implementation of the project "Technical re-equipment. Expansion of resin production. Stage 2. Increase in cold production capacity in workshop No. 32 "for PJSC" Pigment ", Tambov.
Within the framework of this project, it has been implemented - design and working documentation has been developed, equipment has been completed, equipment has been supplied, installation supervision and commissioning work has been carried out with training of production personnel.
LLC “ZAVKOM-ENGINEERING” implemented a rectification unit and a vacuum-evaporation unit for the production of pharmaceutical substrates at LLC “Geropharm”
Scope of supply:
- Supply of equipment
- Installation and supervision works
- Author’s supervision
In 2016, ZAVKOM-ENGINEERING LLC completed work on the construction of a pilot vapor-phase catalytic unit for the process of producing N-methyl-p-anisidine from p-anisidine (N-methyl-p-phenetidine from p-phenetidine) and methanol.
During the implementation of the project, our company performed the following types of work:
- a conceptual diagram was developed
- equipment was calculated
- design and work-design documentation was developed
- key capacitive and reaction equipment was manufactured
- completing with auxiliary equipment and materials
- assembly at the production site and commissioning with the development of a pilot batch of products