Commissioning
Commissioning — the final stage of the project, at which the object is checked in operation and transferred to the customer. Without it, the equipment cannot legally be operated.
Stages
- individual equipment testing;
- comprehensive testing under load;
- eliminating comments and adjusting modes;
- registration of acts and transfer of the object.
What is being drawn up
Test reports, as-built documentation, passports and equipment certificates, operating instructions, orders for personnel admission. A set of documents confirms the readiness of the facility.
Role of commissioning
At this stage, installation errors and design inconsistencies are identified, regulators and protection are configured. The quality of commissioning determines whether the facility will reach its design capacity on time.