Equipment
Equipment — providing the facility with equipment, materials and technical documentation to the extent necessary for installation and commissioning.
Delivery Contents
The package includes main process equipment, pipeline fittings, automation and instrumentation equipment, cable products, metal structures and consumables. Each position is linked to the design specification and installation diagram.
Operating procedure
The work begins with checking design specifications and generating questionnaires. Then technical proposals from manufacturers are requested, analogues and tolerances are agreed upon, a contract is concluded and delivery to the site is organized.
- collection and verification of specifications;
- request for technical proposals;
- coordination of analogues and deadlines;
- incoming control and batch picking.
Documentation and acceptance
For each batch, certificates of conformity, passports, factory test reports and packing lists are provided. Acceptance is carried out according to quantity, nomenclature and completeness, and any comments identified are recorded in the report.
Typical risks
Supply disruptions are most often associated with incomplete specifications, lack of approval of analogues and late reservation of long-cycle items. Therefore, the packaging is carried out in parallel with the design, and not after its completion.