Construction and installation works for industrial enterprises

ZAVKOM-ENGINEERING performs comprehensive construction and installation works within the full cycle of engineering services for high-tech production facilities in petrochemistry, biotechnology and food industry.

We provide professional installation of process systems and equipment in compliance with technical regulations and industrial safety requirements, ensuring high quality and on-time delivery at every project stage.

Construction and installation works include site preparation, installation of process equipment, utilities, automation systems, piping and auxiliary infrastructure. Works are performed at facilities of any complexity within EPC and EPCM contracts, in compliance with international quality, safety and schedule standards.

Scope of construction and installation works

  1. Preparatory works
    • site survey and review of design documentation;
    • site organization, logistics and temporary utilities;
    • development of work execution plans (WEP) and safety plans;
  2. General construction works
    • earthworks and foundation construction;
    • installation of steel structures;
    • preparation of service areas and access routes.
  3. Installation of process equipment
    • installation of industrial vessels, columns and heat exchangers;
    • installation of pump and compressor units and auxiliary systems;
    • precision alignment, centering and rigging.
  4. Piping and installation works
    • assembly of process piping and equipment piping;
    • welding, non-destructive testing (NDT) and pressure testing;
    • thermal insulation, marking and anti-corrosion protection.
  5. Electrical installation and automation
    • installation of power and control networks and distribution cabinets;
    • cable routing and installation of instrumentation;
    • integration and testing of automated control systems.
  6. Commissioning works
    • equipment performance checks;
    • adjustment of process parameters;
    • facility commissioning with technical documentation.

Project implementation stages

  1. Engineering preparation — site survey and clarification of technical requirements.
  2. Design and planning — development of installation plans, WEP and work schedules.
  3. Site preparation — earthworks and temporary utilities.
  4. Installation of equipment and systems — sequential installation of process units.
  5. Testing and commissioning — inspections, adjustments and test runs.
  6. Documentation and handover — as-built documentation and facility commissioning.

What you gain by working with us

  • Construction and installation works within agreed deadlines and budget
  • Compliance with design parameters and technical regulations
  • Quality management at all stages, including NDT and testing
  • Complete as-built documentation
  • Safe work at operating industrial facilities
  • Integration with the overall engineering and equipment supply cycle

Construction and installation works are performed as part of the projects we implement, ensuring an integrated and controlled result.

12years
experience in the
global market
₽25+
billion
value of active contracts
250+ people
company team
170+customers
successfully working
with us
350+
projects
successfully
implemented
7 000+
m²
production
facilities
exporter of the Year 2025
winner of the all-Russian competition
Contact us by phone 8 800 555‑06‑09 oor by sending a request to office@zavkomepc.com