Desulfurization plant for associated petroleum gas for LLC Varandey Terminal

Within the framework of the project, design and survey work, examination of industrial safety, manufacturing and supply of equipment and materials, construction and installation and commissioning were performed. Production of equipment — Gas cleaning unit BOTG.521 — implemented at the capacities of JSC "ZAVKOM".

ZAVKOM-ENGINEERING LLC — the leading Russian full-cycle manufacturing and engineering company, carrying out the construction of objects of the petrochemical, biotechnological and food industry «turnkey». ZAVKOM-ENGINEERING provides services: pre-design work, general design, equipment supply, installation work, production automation, installation supervision and commissioning.