Desulfurization plant for associated petroleum gas for LLC Varandey Terminal

02.03.2017

Within the framework of the project, design and survey work, examination of industrial safety, manufacturing and supply of equipment and materials, construction and installation and commissioning were performed. Production of equipment - Gas cleaning unit BOTG.521 - implemented at the capacities of JSC "ZAVKOM".

upЗадать вопрос