Brewhouse Supply for a new brewery
The project of construction and commissioning new brewhouse for "HANSEN" Ltd in Stavropol was successfully completed.
The third stage of the plant of JSC "AminoSib" for grain processing was launched in Ishim
The other day on the Ishim land there was a remarkable event: the governor of the Tyumen region Vladimir Yakushev opened the plant of JSC "AminoSib" for deep processing of wheat.
Construction of hydrocracking unit with hydrogen production section of hydrocracking complex of PJSC "Orsknefteorgsintez"
In 2016-2017 years. LLC "TD Zavkom" has successfully delivered capacitive equipment (separators, emergency release tanks, irrigation, settling tanks, etc.), as well as heat-exchange equipment (gas and water heaters, reboilers, evaporators of raw materials, etc.) for the construction of hydrocracking unit PJSC "Orsknefteorgsintez ".
Construction of the Yamal LNG plant
Delivery of technological equipment, metal structures for tanks, compressor stripping gas, a warehouse of chemical agents of the Yamal LNG plant was completed.
Installation of vacuum distillation of fuel oil at PJSC "Orsknefteorgsintez"
The scope of work includes the development of working design documentation, the manufacture of equipment, transportation to the construction site, the assembly and installation of the shell of the column in the design position, the fabrication and installation of technological sites, the carrying out of all necessary tests.