
Construction of the Yamal LNG plant
Delivery of technological equipment, metal structures for tanks, compressor stripping gas, a warehouse of chemical agents of the Yamal LNG plant was completed.

Installation of vacuum distillation of fuel oil at PJSC "Orsknefteorgsintez"
The scope of work includes the development of working design documentation, the manufacture of equipment, transportation to the construction site, the assembly and installation of the shell of the column in the design position, the fabrication and installation of technological sites, the carrying out of all necessary tests.

Compressor stations for PJSC Gazprom
At the CS Russkaya, KS Kazachya, Korenovskaya, and Shakhtinskaya, more than 30 units of fuel and buffer gas purification, previously supplied by OOO Omni Technologies, were put into operation. Manufacturing of block equipment was carried out at JSC "ZAVKOM".

An agreement was signed with COFCO Corporation
On July 25, 2017 was signed cooperation agreement between the ZAVCOM group of companies and Chinese Corporation COFCO. COFCO Corporation was founded in 1949. It is included in the list of 500 largest companies of the world and heads top-100 food enterprises of China. The value of the corporation's assets is estimated at $ 72 billion.

Desulfurization plant for associated petroleum gas for LLC Varandey Terminal
Within the framework of the project, design and survey work, examination of industrial safety, manufacturing and supply of equipment and materials, construction and installation and commissioning were performed. Production of equipment - Gas cleaning unit BOTG.521 - implemented at the capacities of JSC "ZAVKOM".