Installation of an amine purification unit from ZAVKOM-ENGINEERING for an industrial alcohol production Plant

Projects

The «CO₂ Removal Unit» installation is being implemented at a domestic enterprise. Our company delivered the process equipment, to the Customer's site, installation work is currently ongoing, and ZAVKOM-ENGINEERING specialists are providing technical management services as part of the installation supervision at the facility.

The scope of supply includes:

  1. Development of design documentation
  2. Development of working documentation (recalculation of material balance and replacement of imported chemicals)
  3. Manufacturing and supply of process equipment:
    • absorption column;
    • desorption column;
    • set of heat exchange equipment, including condenser, reboiler, etc.;
    • set of tank equipment, including absorption agent tank, separator, measuring tanks, drainage tank;
    • set of pumping equipment;
    • set of shut-off valves;
    • set of instrumentation and automation devices and process control system;
    • set of cables and pipelines.
  4. Development of automated process control systems
  5. Manufacturing and supply of control cabinets and power cabinets, as well as software
  6. Installation supervision and commissioning

Contact us at 8 800 555-06-09, and we will answer all your questions about the equipment and engineering services of our company for your production.

Read more about the product: Plants for amine and alkaline purification Contact us by phone 8 800 555‑06‑09 oor by sending a request to office@zavkomepc.com

See also

Watch projects

CO₂ purification unit for an industrial alcohol complex
Implementation
CO₂ purification unit for an industrial alcohol complex
Confidential client
Ульяновск
Industrial complex for the production of industrial alcohols. Installation
Completed
Industrial complex for the production of industrial alcohols. Installation "Synthesis gas"
LLC «RUSOKSO»
Arkhangelsk region

Story

More about us Order TCO