Our company is implementing a project for the supply of an automatic complete wastewater treatment plant for the V.D. Mine. Yalevsky" (JSC SUEK-Kuzbass). The treatment facilities we supply help improve the environmental situation in the Kemerovo region.
The full range of ZAVKOM-ENGINEERING engineering services within the project includes:
- process design;
- development of working design documentation;
- production and complete supply of equipment;
- installation supervision and commissioning works;
- training of the Customer's technological personnel.
JSC SUEK-Kuzbass is a leading production association in terms of coal production. The annual production of thermal grade coal exceeds 30 million tons. Two thirds of the high-quality coal produced is exported. In terms of underground mining volumes, SUEK-Kuzbass consistently ranks first in Russia. At the same time, total reserves amount to more than 2.5 billion tons.
At the moment, the purchase and manufacture of all technological equipment is underway: tanks, flotation units, pumps, automatic filters, UV lamps, instrumentation,shut-off and control valves, spare parts, tools and accessories for commissioning.
Installation of equipment under the supervision of specialists from the installation supervision department of ZAVKOM-ENGINEERING and Enviro-Chemie GmbH LLC (technology licensor) will start in the fourth quarter of 2025, after which our company will carry out installation supervision and commissioning work.
