The production of formaldehyde resins will be built in the Altai Territory
In 2017, LLC "ZAVKOM-ENGINEERING" for Altayles, developed detailed engineering documentation, and in April 2018 made a complex supply of equipment for the installation of urea-formaldehyde resins with a capacity of 33,000 tons / year.
The Congress «Biomass. Fuel and Energy»
The Congress «Biomass. Fuel and Energy», which was held on April 18-19 at the Holiday Inn Lesnaya hotel in Moscow, successfully completed. The Congress was devoted to the use of renewable raw materials in chemistry and petrochemistry.
PJSC«Tatneft»'s tender
As the result of organized tender by PJSC«Tatneft» contract terms with LLC «ZAVKOM-ENGINEERING» for design works of documentation for basic design as part of running the project for bioethanol plant construction with further denatured bioethanol absolution with capacity of 25,000 tons per year were concluded in the 4th quarter of 2017.
Representatives of “ZAVKOM-ENGINEERING” LLC visited the solemn event at PJSC MMK
Representatives of “ZAVKOM-ENGINEERING” LLC, at the invitation of PJSC "Magnitogorsk Iron and Steel Works", on January 31, 2018 took part in the solemn event on the occasion of launching a new plant for processing the naphthalene fraction by the method of high-efficiency rectification.
Completed work on the second stage of expansion of resin production at PJSC “Pigment”
«ZAVKOM-ENGINEERING» LLC completed the work on «Stage2 increase in cold production capacity in workshop No.32» as part of the technical upgrading of the resin production expansion.