Currently, equipment is being manufactured, power and control cabinets are being assembled within the framework of a project with JSC "Ion exchange technologies" for JSC "Gazpromneft ONPZ".
Within the framework of this project, implemented / planned:
- the technology,
- working design documentation was developed,
- the equipment was completed,
- the equipment was manufactured and supplied,
- installation supervision and commissioning were carried out.