As part of the modernization project for Production No. 2.43-103 (catalytic cracking gas regeneration cleaning unit), filtration equipment was supplied and installed.
Scope of supply:
- Development of working design documentation;
- Supply of equipment:
- Filter press
- Compressor
- Tank with mixing device
- Gas receiver
- Pumps
- Set of control and shut-off valves
- Centrifuge
- Supervision of installation works;
- Commissioning works;
- Personnel training.