Crystallization unit X-102

JSC «Gazpromneft ONPZ»
implemented
in 2019

The installation was commissioned in 2019.

Within the framework of this project, the technology, working design documentation was developed, the equipment was completed, manufactured and supplied, installation supervision and commissioning of the crystallization unit based on a vacuum evaporator was carried out.