The unit was put into commercial operation in 2019.
In 2019, ZAVKOM-ENGINEERING LLC successfully completed work on the construction of a urea-formaldehyde resin production unit with a capacity of 33,000 tons per year in Pavlovsk, Altai Territory.
Within the framework of this project, it was implemented — the technology, design and working documentation was developed, the assembly, manufacture and supply of equipment, installation supervision and commissioning were carried out.