The unit was put into commercial operation in 2019.
During the implementation of the project, our company performed the following types of work:
- design and work-design documentation,
- construction and installation work was developed,
- equipment was completed,
- equipment and materials were supplied,
- installation supervision and commissioning were carried out with the development of a pilot batch of products.