▶ Implementation Project for obtaining technical naphthalene JSC «MMK» Magnitogorsk Project for obtaining technical naphthalene JSC «MMK» Magnitogorsk stageImplementation In 2018 ZAVKOM-ENGINEERING LLC completed work on the project for obtaining technical naphthalene with a concentration of at least 97% at Magnitogorsk Metallurgical Plant JSC (MMK JSC) in Magnitogorsk The naphthalene production process is fully automated; the most modern technological equipment from the world's leading suppliers has been supplied. As part of the project, our company performed the following types of work: Development of technology for producing naphthalene from naphthalene-containing fraction Development of design and working documentation; Complete delivery of technological equipment: unit for rectification of naphthalene; alcohol storage; storage warehouse; installation for obtaining flaked naphthalene; Installation supervision; Start-up and adjustment works; Personnel training. To get a consultation
✓ 2018 Crystallization Unit X-102 JSC “Gazpromneft-ONPZ” Omsk Region Crystallization Unit X-102 JSC “Gazpromneft-ONPZ” Omsk Region implementedin 2018 Scope of supply: Supply of equipment To get a consultation
✓ 2018 Synthetic resin production Allnex Belgorod LLC Shebekino Synthetic resin production Allnex Belgorod LLC Shebekino implementedin 2018 In 2018, ZAVKOM-ENGINEERING LLC completed work on the development of individual sections of the design documentation for the construction of the facility: "Industrial facility for the production of synthetic resins on the land plot of ALNEX-BELGOROD LLC, Shebekino. To get a consultation
✓ 2018 Technical re-equipment of the raw material warehouse CJSC «Murom» Murom Technical re-equipment of the raw material warehouse CJSC «Murom» Murom implementedin 2018 In 2018, the company ZAVKOM-ENGINEERING LLC successfully carried out work on the implementation of the project for the technical re-equipment of the raw material warehouse for CJSC Murom in Murom. The storage warehouse for receiving, storing and supplying the production of UFC-85 and 37% formalin contains 6 containers. The process is fully automated, practically does not require human intervention, and the project contains the most modern energy efficient equipment. As part of the project, our company performed the following types of work: Development of design and working documentation; Complete delivery of equipment; 6 tanks, 75m3 each; instrumentation sensors; control cabinet; computer hardware and software; Installation supervision; Designer supervision; Start-up and adjustment works; Personnel training. To get a consultation
✓ 2018 Equipment for the Complex for the production of anti-turbulent additives PJSC «Transneft» for LLC «NIKA-PETROTEK» Naberezhnye Chelny Equipment for the Complex for the production of anti-turbulent additives PJSC «Transneft» for LLC «NIKA-PETROTEK» Naberezhnye Chelny implementedin 2018 In 2018, ZAVKOM-ENGINEERING LLC completed work on the supply of polymerization reactors in the amount of 12 pieces for the Complex for the production of anti-turbulent additives ordered by PJSC Transneft Polymerizing reactors V = 0.63m3 are made of stainless steel with polished inner surfaces (not less than 7 class Ra0.8), complete with modernized ribbon stirring devices PUAMM-4 (350), coaxial magnetic couplings (based on permanent magnets (Sm -Co)) with explosion-proof drives and bottom valves at LLC "NIKA-PETROTEK", Territory "SEZ" Alabuga. To get a consultation
✓ 2018 Loading and feeding unit for sodium sulfide nonahydrate for the deep purification plant of NGL (natural gas liquids) PJSC «Sibur Holding» Khanty-Mansiysk Autonomous Okrug Loading and feeding unit for sodium sulfide nonahydrate for the deep purification plant of NGL (natural gas liquids) PJSC «Sibur Holding» Khanty-Mansiysk Autonomous Okrug implementedin 2018 Scope of supply: Development of design and working documentation Complete supply of equipment Supervision of installation works Commissioning works To get a consultation