Implementation Glue preparation unit LLC «Synergy» Sverdlovsk Region Glue preparation unit LLC «Synergy» Sverdlovsk Region Implementation The unit was implemented within the project “Construction of a plywood production facility and a wood-fired CHP”.At the final stage, our specialists provided technical support for:glue kitchen completion works;water piping;urea glue supply piping to presses;valve installation;valve wiring;chiller piping;fan installation.Scope of supply:DesignManufacture and complete equipment supplyInstallation supervisionCommissioning To get a consultation
Implementation Big-bag de-palletizing system for a glue preparation unit CJSC «Murom» Vladimir Region Big-bag de-palletizing system for a glue preparation unit CJSC «Murom» Vladimir Region Implementation Scope of supply:Equipment supply To get a consultation
Implementation Unit was put into operation Installation of preparation of adhesive composition JSC «AFZ» Arkhangelsk Unit was put into operation Installation of preparation of adhesive composition JSC «AFZ» Arkhangelsk Implementation The unit was put into commercial operation in 2016. In 2016, the company ZAVKOM-ENGINEERING LLC successfully carried out work on the implementation of the project for the construction of an installation for the preparation of an adhesive composition for JSC Arkhangelsk Plywood Plant. To get a consultation
Innovative Technologies of ZAVKOM-ENGINEERING for the Woodworking Industry Were Presented at a Specialized Conference for Enterprises of Russia and the CIS Countries 07.11.2025
We talk about the process operating principles of resin production plants from ZAVKOM-ENGINEERING LLC 06.02.2024