Installation of resin production (MPST)

LLC «Schattdecor»
Tyumen
Completed

The unit was put into commercial operation in 2015.

In 2015, ZAVKOM-ENGINEERING LLC  successfully completed the construction project for the production of urea-formaldehyde resin (PKFT) and melamine-formaldehyde resin (MPST) with a total capacity of 20,000 tons / year.

Within the framework of this project, the project has been implemented — the design and working documentation has been developed, the equipment has been completed, the equipment has been manufactured and supplied, installation supervision and commissioning have been carried out.

Providing the project

Similar projects

Equipment for the production of resins
Completed
Equipment for the production of resins
LLC «Metadynea»
Gubakha
Production of urea-formaldehyde resins
Completed
Production of urea-formaldehyde resins
«Pavlovsky DOK» LLC
Pavlovsk
Technical re-equipment of the raw material warehouse
Completed
Technical re-equipment of the raw material warehouse
CJSC «Murom»
Murom
Supply of equipment for the production of resins
Completed
Supply of equipment for the production of resins
LLC «Metadynea»
Orekhovo-Zuevo