In 2014, ZAVKOM-ENGINEERING LLC successfully completed work on the development of design and working documentation for the production of urea-formaldehyde resins with a capacity of 50,000 tons / year at CJSC "Murom".
Storage warehouse UFC-85 and 37% formalin for CJSC "Murom".
The warehouse was put into operation in 2018.
In 2018, the company 000 ZAVKOM-ENGINEERING implemented a project for the technical re-equipment of a raw material warehouse for ZAO Murom in Murom.
Within the framework of this project, the design and working documentation was developed (the project passed the industrial safety examination), the equipment was completed, manufactured and supplied, the installation supervision and commissioning of the storage warehouse for UFC and formalin were carried out.