▶ Implementation Project for the supply of glue preparation sections LLC «Synergy» Verkhnyaya Tura Project for the supply of glue preparation sections LLC «Synergy» Verkhnyaya Tura stageImplementation The company ZAVKOM-ENGINEERING LLC is currently carrying out work on the implementation of the project for the supply of glue preparation sections based on SFZh-3014 resin with a capacity of 12,480 tons / year (up to 37.82 tons / day) and urea-formaldehyde resin with a capacity of 2000 tons / year (up to 6 , 06 tons / day), resin warehouse and bulk components warehouse at Synergy LLC in Verkhnyaya Tura, Sverdlovsk region. The process of obtaining the adhesive composition is fully automated and practically does not require human intervention; the supply of the most modern technological equipment from the world's leading suppliers is envisaged. As part of the project, our company performs the following types of work: Development of working documentation; Complete delivery of equipment: glue installation of urea-formaldehyde glue; glue installation of phenol-formaldehyde glue; resin warehouse; warehouse of bulk components; auxiliary equipment. Installation supervision; Start-up and adjustment works; Personnel training. To get a consultation
✓ 2014 Installation of preparation of adhesive composition CJSC «Murom» Murom Installation of preparation of adhesive composition CJSC «Murom» Murom implementedin 2014 The unit was put into commercial operation in 2014. In 2014, ZAVKOM-ENGINEERING LLC completed work on the construction of an adhesive preparation plant for Murom CJSC, Murom. To get a consultation
✓ 2014 Project of the production of urea-formaldehyde resins CJSC «Murom» Murom Project of the production of urea-formaldehyde resins CJSC «Murom» Murom implementedin 2014 In 2014, ZAVKOM-ENGINEERING LLC successfully completed work on the development of design and working documentation for the production of urea-formaldehyde resins with a capacity of 50,000 tons / year at CJSC "Murom". Storage warehouse UFC-85 and 37% formalin for CJSC "Murom". The warehouse was put into operation in 2018. In 2018, the company 000 ZAVKOM-ENGINEERING implemented a project for the technical re-equipment of a raw material warehouse for ZAO Murom in Murom. Within the framework of this project, the design and working documentation was developed (the project passed the industrial safety examination), the equipment was completed, manufactured and supplied, the installation supervision and commissioning of the storage warehouse for UFC and formalin were carried out. To get a consultation
✓ 2014 Benzene purification technology Zarya Scientific and Production Enterprise LLC Benzene purification technology Zarya Scientific and Production Enterprise LLC implementedin 2014 In 2014, ZAVKOM-ENGINEERING LLC carried out work on the modernization of the crude benzene purification technology for SPE Zarya LLC. Within the framework of this project, the collection of initial data was carried out and engineering documentation was developed for the modernization of the existing production with an improvement in the quality indicators of the products. To get a consultation