▶ Implementation Stripped water production unit for use as process water LLC "M Synthesis" Republic of Bashkortostan Stripped water production unit for use as process water LLC "M Synthesis" Republic of Bashkortostan stageImplementation The unit is implemented as part of the construction of a new enterprise in Bashkiria for the production of a cetane improver additive for diesel fuels. The plant’s design capacity is 30 thousand tons per year. This is the first Russian plant specializing exclusively in the production of cetane improver additives for oil refining enterprises. Production start-up is scheduled for 2025. Scope of supply: Technology development Development of working design documentation Manufacturing and complete supply of equipment Supervision of installation works Commissioning works To get a consultation
▶ Implementation Evaporation unit LLC "Tekhnotex" Krasnodar Territory Evaporation unit LLC "Tekhnotex" Krasnodar Territory stageImplementation Implementation of an evaporation and crystallization unit for salt concentrate with subsequent dewatering in order to minimize and utilize salt sludge. Within the framework of the project, the following were supplied: tank, filtration, and heat-exchange equipment, pumps, decanter, evaporator, salt column, heating chamber, cooling towers, centrifuges, ejectors, and shut-off and control valves. Scope of supply: Process design Development of RDD Manufacturing and supply of equipment Supervision and commissioning works Personnel training To get a consultation
▶ Implementation Reverse osmosis concentrate polishing unit with a capacity of 900 kg/h LLC "ASP AQUA" for Federal State Unitary Enterprise "Federal Environmental Operator" Irkutsk Region Reverse osmosis concentrate polishing unit with a capacity of 900 kg/h LLC "ASP AQUA" for Federal State Unitary Enterprise "Federal Environmental Operator" Irkutsk Region stageImplementation The Baikal Pulp and Paper Mill operated from 1966 to 2013. It was the city-forming enterprise of the single-industry town of Baikalsk. The plants supplied by LLC "ZAVKOM-ENGINEERING" are part of a station for treating alkali-containing effluents with a capacity of 2,000 m³/day. Infrastructure for the purification and removal of supernatant waters at the Solzansky site is being created within the framework of the federal project for the remediation of accumulated environmental damage caused by the Baikal Pulp and Paper Mill. Supply and installation Scope of supply: Process design Development of detailed design documentation (RDD) Manufacturing and supply of equipment Installation and supervision of installation works Commissioning works Personnel training Scope of supply: To get a consultation
▶ Implementation Reverse Osmosis Concentrate Polishing Unit within the Framework of Remediation of Accumulated Environmental Damage at JSC «Baikal Pulp and Paper Mill» Federal State Unitary Enterprise "Federal Environmental Operator" Irkutsk Region Reverse Osmosis Concentrate Polishing Unit within the Framework of Remediation of Accumulated Environmental Damage at JSC «Baikal Pulp and Paper Mill» Federal State Unitary Enterprise "Federal Environmental Operator" Irkutsk Region stageImplementation The reverse osmosis concentrate polishing unit is located in a prefabricated building, common for three lines, and includes: Reagent softening unit for concentrate; Mechanical dewatering unit for sludge No. 3; Evaporation unit: First stage – evaporation with production of a concentrated product in the form of a liquid salt concentrate; Second stage – further evaporation of the salt concentrate from the first stage to obtain a salt suspension; Third stage – centrifugation (separation of crystalline salts from the liquid phase, obtaining waste with moisture content up to 40%). Scope of supply: Pre-project surveys Development of basic and detailed engineering Process and general design Development and implementation of APCS (Automated Process Control System) Supply of process equipment Supervision of installation works Commissioning works To get a consultation
▶ Implementation Complete filtration unit Wastewater treatment facilities of JSC "Gazpromneft Omsk Refinery" Omsk Region Complete filtration unit Wastewater treatment facilities of JSC "Gazpromneft Omsk Refinery" Omsk Region stageImplementation The complete filtration unit is supplied to the Omsk Refinery within the framework of the project to reduce the concentration of harmful substances in the plant’s industrial wastewater. Thanks to multi-stage treatment, the efficiency of wastewater purification at the Omsk Refinery will increase to 99.9%. Scope of supply: Complete supply of equipment Commissioning works To get a consultation
✓ 2024 Rectification column with scrubber JSC «Ion-Exchange Technologies» Moscow Region Rectification column with scrubber JSC «Ion-Exchange Technologies» Moscow Region implementedin 2024 Scope of supply: Development of working design documentation; Supply of equipment; Supervision of installation works; Commissioning works. To get a consultation
✓ 2023 Salt concentrate evaporation units for industrial waste landfill Confidential Client Leningrad Region Salt concentrate evaporation units for industrial waste landfill Confidential Client Leningrad Region implementedin 2023 The installations are equipped with mechanical vapor recompression (MVR) and forced circulation technologies, which contribute to resource saving, improve energy efficiency and profitability of production, and ensure environmental safety. The equipment was implemented within the framework of a project for landfill reclamation and industrial waste processing. Scope of supply: Development of working design documentation Manufacturing and complete supply of equipment Installation works Commissioning works Technology video overview Installation video overview Installation model To get a consultation
▶ Implementation Blocks of buffer tanks, emergency tanks as part of the development of the Yuzhno-Kirinskoye oil and gas condensate field PJSC «Gazprom» Sakhalin Blocks of buffer tanks, emergency tanks as part of the development of the Yuzhno-Kirinskoye oil and gas condensate field PJSC «Gazprom» Sakhalin stageImplementation The project implemented: Development of design and detailed documentation Production and complete supply of equipment To get a consultation
✓ 2021 Evaporation plant LLC "NPO Ecosystem" Moscow Region Evaporation plant LLC "NPO Ecosystem" Moscow Region implementedin 2021 Scope of supply: Supply of equipment To get a consultation
✓ 2022 Equipment for rectification and vacuum evaporation installations LLC «Geropharm» Saint Petersburg Equipment for rectification and vacuum evaporation installations LLC «Geropharm» Saint Petersburg implementedin 2022 Оборудование для установки ректификации и вакуум-выпарной установки. The project implemented: General design Complete supply of equipment Commissioning work Construction and installation work The project has been implemented. To get a consultation
✓ 2021 Filtration equipment within the modernization of the catalytic cracking gas regeneration-cleaning unit JSC «Gazpromneft-ONPZ» Omsk Region Filtration equipment within the modernization of the catalytic cracking gas regeneration-cleaning unit JSC «Gazpromneft-ONPZ» Omsk Region implementedin 2021 As part of the modernization project for Production No. 2.43-103 (catalytic cracking gas regeneration cleaning unit), filtration equipment was supplied and installed. Scope of supply: Development of working design documentation; Supply of equipment: Filter press Compressor Tank with mixing device Gas receiver Pumps Set of control and shut-off valves Centrifuge Supervision of installation works; Commissioning works; Personnel training. To get a consultation
✓ 2021 Acetone regeneration plants by rectification method LLC «SAMSON-MED» Leningrad Region Acetone regeneration plants by rectification method LLC «SAMSON-MED» Leningrad Region implementedin 2021 Scope of supply: Technology development Development of design documentation Equipment procurement Manufacturing and supply of equipment Supervision of installation works Commissioning works To get a consultation
▶ Implementation Unit for rectification and vacuum evaporation plant for local wastewater treatment plants JSC «Gazpromneft ONPZ» Unit for rectification and vacuum evaporation plant for local wastewater treatment plants JSC «Gazpromneft ONPZ» stageImplementation Currently, equipment is being manufactured, power and control cabinets are being assembled within the framework of a project with JSC "Ion exchange technologies" for JSC "Gazpromneft ONPZ". Within the framework of this project, implemented / planned: the technology, working design documentation was developed, the equipment was completed, the equipment was manufactured and supplied, installation supervision and commissioning were carried out. To get a consultation
✓ 2021 Equipment for the expansion of caprolactam production «Shchekino Azot» LLC Shchekino Equipment for the expansion of caprolactam production «Shchekino Azot» LLC Shchekino implementedin 2021 The equipment was put into operation in 2021. As part of the implementation of this project, a design documentation has been developed, a roll-type crystallizer with a capacity of 4000 kg / h has been supplied, installation supervision and commissioning have been carried out. To get a consultation
✓ 2020 Acetone regeneration plants by rectification method LLC "SAMSON-MED" Leningrad Region Acetone regeneration plants by rectification method LLC "SAMSON-MED" Leningrad Region implementedin 2020 Scope of supply: Supply of equipment To get a consultation
✓ 2021 Installation of resin production LLC «Schattdecor» Moscow Installation of resin production LLC «Schattdecor» Moscow implementedin 2021 At the current time, commissioning works are being carried out. The projected unit is intended for the production of urea-formaldehyde resin (PKFT) and melamine-formaldehyde resin (MPST) with a total capacity of up to 42,240 tons per year. Within the framework of this project, implemented / planned - the design and working documentation was developed, the equipment was completed, the manufacture and supply of equipment, installation supervision and commissioning were carried out. To get a consultation
✓ 2020 Equipment for the production of resins LLC «Metadynea» Gubakha Equipment for the production of resins LLC «Metadynea» Gubakha implementedin 2020 In 2020, ZAVKOM-ENGINEERING LLC completed work on the supply of equipment to Metadynea LLC in the city of Gubakha. Within the framework of this project, the following equipment was implemented - designed, manufactured and supplied: reaction equipment (synthesis reactor, condenser and hopper), scrubber, capacitive and filtering equipment. To get a consultation
✓ 2020 Installation of naphthalene production JSC «ММК» Magnitogorsk Installation of naphthalene production JSC «ММК» Magnitogorsk implementedin 2020 The unit was put into commercial operation in 2020. In 2018, ZAVKOM-ENGINEERING LLC completed work on the project for obtaining technical naphthalene with a concentration of at least 97% at Magnitogorsk Metallurgical Plant JSC (MMK JSC) in Magnitogorsk. To get a consultation
✓ 2020 Industrial complex for the production of industrial alcohols. Installation "Synthesis gas" LLC «RUSOKSO» Industrial complex for the production of industrial alcohols. Installation "Synthesis gas" LLC «RUSOKSO» implementedin 2020 In 2020, ZAVKOM-ENGINEERING LLC performed the design of the following units and systems within the framework of this project: vacuum-generating system of the "VACUUM PACKAGE" cleaning unit; CO2 removal unit (based on rectification columns); PSA unit designed for gas purification (separation into ready hydrogen and synthesis gas). To get a consultation
✓ 2019 Acetone regeneration plants by rectification method LLC “SAMSON-MED” Leningrad Region Acetone regeneration plants by rectification method LLC “SAMSON-MED” Leningrad Region implementedin 2019 Scope of supply: Development of design documentation Supply of equipment To get a consultation
✓ 2019 Local WWTP based on vacuum evaporation unit for treatment of wastewater from lithium ions JSC "Voronezhsintezkauchuk", PJSC "Sibur Holding" Voronezh Region Local WWTP based on vacuum evaporation unit for treatment of wastewater from lithium ions JSC "Voronezhsintezkauchuk", PJSC "Sibur Holding" Voronezh Region implementedin 2019 The local wastewater treatment plant is part of the thermoplastic elastomer production at JSC "Voronezhsintezkauchuk" and allows purification of wastewater from lithium ions to a level below 0.08 ppm, ensuring environmental safety of the main production for the entire region. Scope of supply: Technology development Development of working design documentation Manufacturing and complete supply of equipment Supervision of installation works Commissioning works Technology video overview To get a consultation
✓ 2019 Production of urea-formaldehyde resins «Pavlovsky DOK» LLC Pavlovsk Production of urea-formaldehyde resins «Pavlovsky DOK» LLC Pavlovsk implementedin 2019 The unit was put into commercial operation in 2019. In 2019, ZAVKOM-ENGINEERING LLC successfully completed work on the construction of a urea-formaldehyde resin production unit with a capacity of 33,000 tons per year in Pavlovsk, Altai Territory. Within the framework of this project, it was implemented — the technology, design and working documentation was developed, the assembly, manufacture and supply of equipment, installation supervision and commissioning were carried out. To get a consultation
✓ 2019 Crystallization unit X-102 JSC «Gazpromneft ONPZ» Omsk Region Crystallization unit X-102 JSC «Gazpromneft ONPZ» Omsk Region implementedin 2019 The plant is designed to convert the main portion of sodium sulfate salts into solid state by the method of vacuum-evaporation crystallization. Scope of supply: Technology development Design documentation development Equipment procurement Manufacturing and supply of equipment Supervision of installation works Commissioning works To get a consultation
▶ Implementation Project for obtaining technical naphthalene JSC «MMK» Magnitogorsk Project for obtaining technical naphthalene JSC «MMK» Magnitogorsk stageImplementation In 2018 ZAVKOM-ENGINEERING LLC completed work on the project for obtaining technical naphthalene with a concentration of at least 97% at Magnitogorsk Metallurgical Plant JSC (MMK JSC) in Magnitogorsk The naphthalene production process is fully automated; the most modern technological equipment from the world's leading suppliers has been supplied. As part of the project, our company performed the following types of work: Development of technology for producing naphthalene from naphthalene-containing fraction Development of design and working documentation; Complete delivery of technological equipment: unit for rectification of naphthalene; alcohol storage; storage warehouse; installation for obtaining flaked naphthalene; Installation supervision; Start-up and adjustment works; Personnel training. To get a consultation
✓ 2018 Crystallization Unit X-102 JSC “Gazpromneft-ONPZ” Omsk Region Crystallization Unit X-102 JSC “Gazpromneft-ONPZ” Omsk Region implementedin 2018 Scope of supply: Supply of equipment To get a consultation
✓ 2018 Synthetic resin production Allnex Belgorod LLC Shebekino Synthetic resin production Allnex Belgorod LLC Shebekino implementedin 2018 In 2018, ZAVKOM-ENGINEERING LLC completed work on the development of individual sections of the design documentation for the construction of the facility: "Industrial facility for the production of synthetic resins on the land plot of ALNEX-BELGOROD LLC, Shebekino. To get a consultation
✓ 2018 Technical re-equipment of the raw material warehouse CJSC «Murom» Murom Technical re-equipment of the raw material warehouse CJSC «Murom» Murom implementedin 2018 In 2018, the company ZAVKOM-ENGINEERING LLC successfully carried out work on the implementation of the project for the technical re-equipment of the raw material warehouse for CJSC Murom in Murom. The storage warehouse for receiving, storing and supplying the production of UFC-85 and 37% formalin contains 6 containers. The process is fully automated, practically does not require human intervention, and the project contains the most modern energy efficient equipment. As part of the project, our company performed the following types of work: Development of design and working documentation; Complete delivery of equipment; 6 tanks, 75m3 each; instrumentation sensors; control cabinet; computer hardware and software; Installation supervision; Designer supervision; Start-up and adjustment works; Personnel training. To get a consultation
✓ 2018 Equipment for the Complex for the production of anti-turbulent additives PJSC «Transneft» for LLC «NIKA-PETROTEK» Naberezhnye Chelny Equipment for the Complex for the production of anti-turbulent additives PJSC «Transneft» for LLC «NIKA-PETROTEK» Naberezhnye Chelny implementedin 2018 In 2018, ZAVKOM-ENGINEERING LLC completed work on the supply of polymerization reactors in the amount of 12 pieces for the Complex for the production of anti-turbulent additives ordered by PJSC Transneft Polymerizing reactors V = 0.63m3 are made of stainless steel with polished inner surfaces (not less than 7 class Ra0.8), complete with modernized ribbon stirring devices PUAMM-4 (350), coaxial magnetic couplings (based on permanent magnets (Sm -Co)) with explosion-proof drives and bottom valves at LLC "NIKA-PETROTEK", Territory "SEZ" Alabuga. To get a consultation
✓ 2018 Loading and feeding unit for sodium sulfide nonahydrate for the deep purification plant of NGL (natural gas liquids) PJSC «Sibur Holding» Khanty-Mansiysk Autonomous Okrug Loading and feeding unit for sodium sulfide nonahydrate for the deep purification plant of NGL (natural gas liquids) PJSC «Sibur Holding» Khanty-Mansiysk Autonomous Okrug implementedin 2018 Scope of supply: Development of design and working documentation Complete supply of equipment Supervision of installation works Commissioning works To get a consultation
✓ 2017 Installation of increasing the capacity of cold production PJSC «Pigment» Tambov Installation of increasing the capacity of cold production PJSC «Pigment» Tambov implementedin 2017 The absorption refrigeration machine was put into commercial operation in 2017. The company 000 "ZAVKOM-ENGINEERING" in 2017 successfully carried out work on the implementation of the project "Technical re-equipment. Expansion of resin production. Stage 2. Increase in cold production capacity in workshop No. 32 "for PJSC" Pigment ", Tambov. Within the framework of this project, it has been implemented - design and working documentation has been developed, equipment has been completed, equipment has been supplied, installation supervision and commissioning work has been carried out with training of production personnel. To get a consultation
✓ 2017 Rectification and vacuum evaporation unit — supply and start-up «Geropharm» LLC Saint Petersburg Rectification and vacuum evaporation unit — supply and start-up «Geropharm» LLC Saint Petersburg implementedin 2017 LLC “ZAVKOM-ENGINEERING” implemented a rectification unit and a vacuum-evaporation unit for the production of pharmaceutical substrates at LLC “Geropharm” Scope of supply: Supply of equipment Installation and supervision works Author’s supervision To get a consultation
✓ 2017 Supply of equipment for the production of resins LLC «Metadynea» Orekhovo-Zuevo Supply of equipment for the production of resins LLC «Metadynea» Orekhovo-Zuevo implementedin 2017 In 2017, ZAVKOM-ENGINEERING LLC completed work on the supply of equipment to Metadynea LLC in the town of Orekhovo-Zuevo. As part of the project to expand the production of formaldehyde resins, our company has designed and supplied reactor, capacitive and heat exchange equipment. To get a consultation
✓ 2016 Rectification and vacuum evaporation unit — development of detailed design documentation LLC “Geropharm” Saint Petersburg Rectification and vacuum evaporation unit — development of detailed design documentation LLC “Geropharm” Saint Petersburg implementedin 2016 Scope of supply: Development of individual sections of working documentation Development of design documentation To get a consultation
✓ 2016 Pilot vapor-phase catalytic plant «IFOTOP» LLC (Skolkovo resident) Skolkovo Pilot vapor-phase catalytic plant «IFOTOP» LLC (Skolkovo resident) Skolkovo implementedin 2016 In 2016, ZAVKOM-ENGINEERING LLC completed work on the construction of a pilot vapor-phase catalytic unit for the process of producing N-methyl-p-anisidine from p-anisidine (N-methyl-p-phenetidine from p-phenetidine) and methanol. During the implementation of the project, our company performed the following types of work: a conceptual diagram was developed equipment was calculated design and work-design documentation was developed key capacitive and reaction equipment was manufactured completing with auxiliary equipment and materials assembly at the production site and commissioning with the development of a pilot batch of products To get a consultation
✓ 2016 Unit was put into operation Installation of preparation of adhesive composition JSC «AFZ» Arkhangelsk Unit was put into operation Installation of preparation of adhesive composition JSC «AFZ» Arkhangelsk implementedin 2016 The unit was put into commercial operation in 2016. In 2016, the company ZAVKOM-ENGINEERING LLC successfully carried out work on the implementation of the project for the construction of an installation for the preparation of an adhesive composition for JSC Arkhangelsk Plywood Plant. To get a consultation
✓ 2016 Pilot plant DSSK-4 PJSC «Sibur Holding» Voronezh Pilot plant DSSK-4 PJSC «Sibur Holding» Voronezh implementedin 2016 As part of the implementation of this project, design and working documentation has been developed. To get a consultation
✓ 2016 Pilot vapor-phase catalytic units for the synthesis of divinyl from ethanol «ETB Kat» LLC (Skolkovo resident) Skolkovo Pilot vapor-phase catalytic units for the synthesis of divinyl from ethanol «ETB Kat» LLC (Skolkovo resident) Skolkovo implementedin 2016 In 2016, ZAVKOM-ENGINEERING LLC completed work on the construction of a pilot vapor-phase catalytic unit for the synthesis of divinyl from ethanol. During the implementation of the project, our company performed the following types of work: a conceptual diagram was developed equipment was calculated design and work-design documentation was developed key capacitive and reaction equipment was manufactured completing with auxiliary equipment and materials assembly at the production site and commissioning with the development of a pilot batch of products To get a consultation
✓ 2015 Production of UFC and resins LLC «PDK Apsheronsk» Apsheronsk Production of UFC and resins LLC «PDK Apsheronsk» Apsheronsk implementedin 2015 In 2015, ZAVKOM-ENGINEERING LLC completed the design of the UFC-85 production facility with a capacity of 40,000 tons / year and urea-formaldehyde resins with a capacity of 58,000 tons / year for OOO PDK Apsheronsk, Apsheronsk Within the framework of this project, it has been implemented — design and working documentation has been developed (the project has passed the state examination), complete set, manufacture and delivery of equipment for warehouses for storage of raw materials and finished products (storage warehouse for methanol, resins and UFC). To get a consultation
✓ 2015 Installation of resin production (MPST) LLC «Schattdecor» Tyumen Installation of resin production (MPST) LLC «Schattdecor» Tyumen implementedin 2015 The unit was put into commercial operation in 2015. In 2015, ZAVKOM-ENGINEERING LLC successfully completed the construction project for the production of urea-formaldehyde resin (PKFT) and melamine-formaldehyde resin (MPST) with a total capacity of 20,000 tons / year. Within the framework of this project, the project has been implemented — the design and working documentation has been developed, the equipment has been completed, the equipment has been manufactured and supplied, installation supervision and commissioning have been carried out. To get a consultation
▶ Implementation Project for the supply of glue preparation sections LLC «Synergy» Verkhnyaya Tura Project for the supply of glue preparation sections LLC «Synergy» Verkhnyaya Tura stageImplementation The company ZAVKOM-ENGINEERING LLC is currently carrying out work on the implementation of the project for the supply of glue preparation sections based on SFZh-3014 resin with a capacity of 12,480 tons / year (up to 37.82 tons / day) and urea-formaldehyde resin with a capacity of 2000 tons / year (up to 6 , 06 tons / day), resin warehouse and bulk components warehouse at Synergy LLC in Verkhnyaya Tura, Sverdlovsk region. The process of obtaining the adhesive composition is fully automated and practically does not require human intervention; the supply of the most modern technological equipment from the world's leading suppliers is envisaged. As part of the project, our company performs the following types of work: Development of working documentation; Complete delivery of equipment: glue installation of urea-formaldehyde glue; glue installation of phenol-formaldehyde glue; resin warehouse; warehouse of bulk components; auxiliary equipment. Installation supervision; Start-up and adjustment works; Personnel training. To get a consultation
✓ 2014 Installation of preparation of adhesive composition CJSC «Murom» Murom Installation of preparation of adhesive composition CJSC «Murom» Murom implementedin 2014 The unit was put into commercial operation in 2014. In 2014, ZAVKOM-ENGINEERING LLC completed work on the construction of an adhesive preparation plant for Murom CJSC, Murom. To get a consultation
✓ 2014 Project of the production of urea-formaldehyde resins CJSC «Murom» Murom Project of the production of urea-formaldehyde resins CJSC «Murom» Murom implementedin 2014 In 2014, ZAVKOM-ENGINEERING LLC successfully completed work on the development of design and working documentation for the production of urea-formaldehyde resins with a capacity of 50,000 tons / year at CJSC "Murom". Storage warehouse UFC-85 and 37% formalin for CJSC "Murom". The warehouse was put into operation in 2018. In 2018, the company 000 ZAVKOM-ENGINEERING implemented a project for the technical re-equipment of a raw material warehouse for ZAO Murom in Murom. Within the framework of this project, the design and working documentation was developed (the project passed the industrial safety examination), the equipment was completed, manufactured and supplied, the installation supervision and commissioning of the storage warehouse for UFC and formalin were carried out. To get a consultation
✓ 2014 Benzene purification technology Zarya Scientific and Production Enterprise LLC Benzene purification technology Zarya Scientific and Production Enterprise LLC implementedin 2014 In 2014, ZAVKOM-ENGINEERING LLC carried out work on the modernization of the crude benzene purification technology for SPE Zarya LLC. Within the framework of this project, the collection of initial data was carried out and engineering documentation was developed for the modernization of the existing production with an improvement in the quality indicators of the products. To get a consultation
▶ Implementation Complete filtration unit Wastewater treatment facilities of JSC "Gazpromneft Omsk Refinery" Omsk Region Complete filtration unit Wastewater treatment facilities of JSC "Gazpromneft Omsk Refinery" Omsk Region stageImplementation The complete filtration unit is supplied to the Omsk Refinery within the framework of the project to reduce the concentration of harmful substances in the plant’s industrial wastewater. Thanks to multi-stage treatment, the efficiency of wastewater purification at the Omsk Refinery will increase to 99.9%. Scope of supply: Complete supply of equipment Commissioning works To get a consultation
▶ Implementation Reverse Osmosis Concentrate Polishing Unit within the Framework of Remediation of Accumulated Environmental Damage at JSC «Baikal Pulp and Paper Mill» Federal State Unitary Enterprise "Federal Environmental Operator" Irkutsk Region Reverse Osmosis Concentrate Polishing Unit within the Framework of Remediation of Accumulated Environmental Damage at JSC «Baikal Pulp and Paper Mill» Federal State Unitary Enterprise "Federal Environmental Operator" Irkutsk Region stageImplementation The reverse osmosis concentrate polishing unit is located in a prefabricated building, common for three lines, and includes: Reagent softening unit for concentrate; Mechanical dewatering unit for sludge No. 3; Evaporation unit: First stage – evaporation with production of a concentrated product in the form of a liquid salt concentrate; Second stage – further evaporation of the salt concentrate from the first stage to obtain a salt suspension; Third stage – centrifugation (separation of crystalline salts from the liquid phase, obtaining waste with moisture content up to 40%). Scope of supply: Pre-project surveys Development of basic and detailed engineering Process and general design Development and implementation of APCS (Automated Process Control System) Supply of process equipment Supervision of installation works Commissioning works To get a consultation
▶ Implementation Reverse osmosis concentrate polishing unit with a capacity of 900 kg/h LLC "ASP AQUA" for Federal State Unitary Enterprise "Federal Environmental Operator" Irkutsk Region Reverse osmosis concentrate polishing unit with a capacity of 900 kg/h LLC "ASP AQUA" for Federal State Unitary Enterprise "Federal Environmental Operator" Irkutsk Region stageImplementation The Baikal Pulp and Paper Mill operated from 1966 to 2013. It was the city-forming enterprise of the single-industry town of Baikalsk. The plants supplied by LLC "ZAVKOM-ENGINEERING" are part of a station for treating alkali-containing effluents with a capacity of 2,000 m³/day. Infrastructure for the purification and removal of supernatant waters at the Solzansky site is being created within the framework of the federal project for the remediation of accumulated environmental damage caused by the Baikal Pulp and Paper Mill. Supply and installation Scope of supply: Process design Development of detailed design documentation (RDD) Manufacturing and supply of equipment Installation and supervision of installation works Commissioning works Personnel training Scope of supply: To get a consultation
▶ Implementation Evaporation unit LLC "Tekhnotex" Krasnodar Territory Evaporation unit LLC "Tekhnotex" Krasnodar Territory stageImplementation Implementation of an evaporation and crystallization unit for salt concentrate with subsequent dewatering in order to minimize and utilize salt sludge. Within the framework of the project, the following were supplied: tank, filtration, and heat-exchange equipment, pumps, decanter, evaporator, salt column, heating chamber, cooling towers, centrifuges, ejectors, and shut-off and control valves. Scope of supply: Process design Development of RDD Manufacturing and supply of equipment Supervision and commissioning works Personnel training To get a consultation
▶ Implementation Stripped water production unit for use as process water LLC "M Synthesis" Republic of Bashkortostan Stripped water production unit for use as process water LLC "M Synthesis" Republic of Bashkortostan stageImplementation The unit is implemented as part of the construction of a new enterprise in Bashkiria for the production of a cetane improver additive for diesel fuels. The plant’s design capacity is 30 thousand tons per year. This is the first Russian plant specializing exclusively in the production of cetane improver additives for oil refining enterprises. Production start-up is scheduled for 2025. Scope of supply: Technology development Development of working design documentation Manufacturing and complete supply of equipment Supervision of installation works Commissioning works To get a consultation
✓ 2024 Rectification column with scrubber JSC «Ion-Exchange Technologies» Moscow Region Rectification column with scrubber JSC «Ion-Exchange Technologies» Moscow Region implementedin 2024 Scope of supply: Development of working design documentation; Supply of equipment; Supervision of installation works; Commissioning works. To get a consultation
▶ Implementation Blocks of buffer tanks, emergency tanks as part of the development of the Yuzhno-Kirinskoye oil and gas condensate field PJSC «Gazprom» Sakhalin Blocks of buffer tanks, emergency tanks as part of the development of the Yuzhno-Kirinskoye oil and gas condensate field PJSC «Gazprom» Sakhalin stageImplementation The project implemented: Development of design and detailed documentation Production and complete supply of equipment To get a consultation
✓ 2023 Salt concentrate evaporation units for industrial waste landfill Confidential Client Leningrad Region Salt concentrate evaporation units for industrial waste landfill Confidential Client Leningrad Region implementedin 2023 The installations are equipped with mechanical vapor recompression (MVR) and forced circulation technologies, which contribute to resource saving, improve energy efficiency and profitability of production, and ensure environmental safety. The equipment was implemented within the framework of a project for landfill reclamation and industrial waste processing. Scope of supply: Development of working design documentation Manufacturing and complete supply of equipment Installation works Commissioning works Technology video overview Installation video overview Installation model To get a consultation
✓ 2022 Equipment for rectification and vacuum evaporation installations LLC «Geropharm» Saint Petersburg Equipment for rectification and vacuum evaporation installations LLC «Geropharm» Saint Petersburg implementedin 2022 Оборудование для установки ректификации и вакуум-выпарной установки. The project implemented: General design Complete supply of equipment Commissioning work Construction and installation work The project has been implemented. To get a consultation
✓ 2021 Installation of resin production LLC «Schattdecor» Moscow Installation of resin production LLC «Schattdecor» Moscow implementedin 2021 At the current time, commissioning works are being carried out. The projected unit is intended for the production of urea-formaldehyde resin (PKFT) and melamine-formaldehyde resin (MPST) with a total capacity of up to 42,240 tons per year. Within the framework of this project, implemented / planned - the design and working documentation was developed, the equipment was completed, the manufacture and supply of equipment, installation supervision and commissioning were carried out. To get a consultation
✓ 2021 Equipment for the expansion of caprolactam production «Shchekino Azot» LLC Shchekino Equipment for the expansion of caprolactam production «Shchekino Azot» LLC Shchekino implementedin 2021 The equipment was put into operation in 2021. As part of the implementation of this project, a design documentation has been developed, a roll-type crystallizer with a capacity of 4000 kg / h has been supplied, installation supervision and commissioning have been carried out. To get a consultation
▶ Implementation Unit for rectification and vacuum evaporation plant for local wastewater treatment plants JSC «Gazpromneft ONPZ» Unit for rectification and vacuum evaporation plant for local wastewater treatment plants JSC «Gazpromneft ONPZ» stageImplementation Currently, equipment is being manufactured, power and control cabinets are being assembled within the framework of a project with JSC "Ion exchange technologies" for JSC "Gazpromneft ONPZ". Within the framework of this project, implemented / planned: the technology, working design documentation was developed, the equipment was completed, the equipment was manufactured and supplied, installation supervision and commissioning were carried out. To get a consultation
✓ 2021 Acetone regeneration plants by rectification method LLC «SAMSON-MED» Leningrad Region Acetone regeneration plants by rectification method LLC «SAMSON-MED» Leningrad Region implementedin 2021 Scope of supply: Technology development Development of design documentation Equipment procurement Manufacturing and supply of equipment Supervision of installation works Commissioning works To get a consultation
✓ 2021 Filtration equipment within the modernization of the catalytic cracking gas regeneration-cleaning unit JSC «Gazpromneft-ONPZ» Omsk Region Filtration equipment within the modernization of the catalytic cracking gas regeneration-cleaning unit JSC «Gazpromneft-ONPZ» Omsk Region implementedin 2021 As part of the modernization project for Production No. 2.43-103 (catalytic cracking gas regeneration cleaning unit), filtration equipment was supplied and installed. Scope of supply: Development of working design documentation; Supply of equipment: Filter press Compressor Tank with mixing device Gas receiver Pumps Set of control and shut-off valves Centrifuge Supervision of installation works; Commissioning works; Personnel training. To get a consultation
✓ 2021 Evaporation plant LLC "NPO Ecosystem" Moscow Region Evaporation plant LLC "NPO Ecosystem" Moscow Region implementedin 2021 Scope of supply: Supply of equipment To get a consultation
✓ 2020 Industrial complex for the production of industrial alcohols. Installation "Synthesis gas" LLC «RUSOKSO» Industrial complex for the production of industrial alcohols. Installation "Synthesis gas" LLC «RUSOKSO» implementedin 2020 In 2020, ZAVKOM-ENGINEERING LLC performed the design of the following units and systems within the framework of this project: vacuum-generating system of the "VACUUM PACKAGE" cleaning unit; CO2 removal unit (based on rectification columns); PSA unit designed for gas purification (separation into ready hydrogen and synthesis gas). To get a consultation
✓ 2020 Installation of naphthalene production JSC «ММК» Magnitogorsk Installation of naphthalene production JSC «ММК» Magnitogorsk implementedin 2020 The unit was put into commercial operation in 2020. In 2018, ZAVKOM-ENGINEERING LLC completed work on the project for obtaining technical naphthalene with a concentration of at least 97% at Magnitogorsk Metallurgical Plant JSC (MMK JSC) in Magnitogorsk. To get a consultation
✓ 2020 Equipment for the production of resins LLC «Metadynea» Gubakha Equipment for the production of resins LLC «Metadynea» Gubakha implementedin 2020 In 2020, ZAVKOM-ENGINEERING LLC completed work on the supply of equipment to Metadynea LLC in the city of Gubakha. Within the framework of this project, the following equipment was implemented - designed, manufactured and supplied: reaction equipment (synthesis reactor, condenser and hopper), scrubber, capacitive and filtering equipment. To get a consultation
✓ 2020 Acetone regeneration plants by rectification method LLC "SAMSON-MED" Leningrad Region Acetone regeneration plants by rectification method LLC "SAMSON-MED" Leningrad Region implementedin 2020 Scope of supply: Supply of equipment To get a consultation
✓ 2019 Crystallization unit X-102 JSC «Gazpromneft ONPZ» Omsk Region Crystallization unit X-102 JSC «Gazpromneft ONPZ» Omsk Region implementedin 2019 The plant is designed to convert the main portion of sodium sulfate salts into solid state by the method of vacuum-evaporation crystallization. Scope of supply: Technology development Design documentation development Equipment procurement Manufacturing and supply of equipment Supervision of installation works Commissioning works To get a consultation
✓ 2019 Production of urea-formaldehyde resins «Pavlovsky DOK» LLC Pavlovsk Production of urea-formaldehyde resins «Pavlovsky DOK» LLC Pavlovsk implementedin 2019 The unit was put into commercial operation in 2019. In 2019, ZAVKOM-ENGINEERING LLC successfully completed work on the construction of a urea-formaldehyde resin production unit with a capacity of 33,000 tons per year in Pavlovsk, Altai Territory. Within the framework of this project, it was implemented — the technology, design and working documentation was developed, the assembly, manufacture and supply of equipment, installation supervision and commissioning were carried out. To get a consultation
✓ 2019 Local WWTP based on vacuum evaporation unit for treatment of wastewater from lithium ions JSC "Voronezhsintezkauchuk", PJSC "Sibur Holding" Voronezh Region Local WWTP based on vacuum evaporation unit for treatment of wastewater from lithium ions JSC "Voronezhsintezkauchuk", PJSC "Sibur Holding" Voronezh Region implementedin 2019 The local wastewater treatment plant is part of the thermoplastic elastomer production at JSC "Voronezhsintezkauchuk" and allows purification of wastewater from lithium ions to a level below 0.08 ppm, ensuring environmental safety of the main production for the entire region. Scope of supply: Technology development Development of working design documentation Manufacturing and complete supply of equipment Supervision of installation works Commissioning works Technology video overview To get a consultation
✓ 2019 Acetone regeneration plants by rectification method LLC “SAMSON-MED” Leningrad Region Acetone regeneration plants by rectification method LLC “SAMSON-MED” Leningrad Region implementedin 2019 Scope of supply: Development of design documentation Supply of equipment To get a consultation
✓ 2018 Loading and feeding unit for sodium sulfide nonahydrate for the deep purification plant of NGL (natural gas liquids) PJSC «Sibur Holding» Khanty-Mansiysk Autonomous Okrug Loading and feeding unit for sodium sulfide nonahydrate for the deep purification plant of NGL (natural gas liquids) PJSC «Sibur Holding» Khanty-Mansiysk Autonomous Okrug implementedin 2018 Scope of supply: Development of design and working documentation Complete supply of equipment Supervision of installation works Commissioning works To get a consultation
✓ 2018 Equipment for the Complex for the production of anti-turbulent additives PJSC «Transneft» for LLC «NIKA-PETROTEK» Naberezhnye Chelny Equipment for the Complex for the production of anti-turbulent additives PJSC «Transneft» for LLC «NIKA-PETROTEK» Naberezhnye Chelny implementedin 2018 In 2018, ZAVKOM-ENGINEERING LLC completed work on the supply of polymerization reactors in the amount of 12 pieces for the Complex for the production of anti-turbulent additives ordered by PJSC Transneft Polymerizing reactors V = 0.63m3 are made of stainless steel with polished inner surfaces (not less than 7 class Ra0.8), complete with modernized ribbon stirring devices PUAMM-4 (350), coaxial magnetic couplings (based on permanent magnets (Sm -Co)) with explosion-proof drives and bottom valves at LLC "NIKA-PETROTEK", Territory "SEZ" Alabuga. To get a consultation
✓ 2018 Technical re-equipment of the raw material warehouse CJSC «Murom» Murom Technical re-equipment of the raw material warehouse CJSC «Murom» Murom implementedin 2018 In 2018, the company ZAVKOM-ENGINEERING LLC successfully carried out work on the implementation of the project for the technical re-equipment of the raw material warehouse for CJSC Murom in Murom. The storage warehouse for receiving, storing and supplying the production of UFC-85 and 37% formalin contains 6 containers. The process is fully automated, practically does not require human intervention, and the project contains the most modern energy efficient equipment. As part of the project, our company performed the following types of work: Development of design and working documentation; Complete delivery of equipment; 6 tanks, 75m3 each; instrumentation sensors; control cabinet; computer hardware and software; Installation supervision; Designer supervision; Start-up and adjustment works; Personnel training. To get a consultation
✓ 2018 Synthetic resin production Allnex Belgorod LLC Shebekino Synthetic resin production Allnex Belgorod LLC Shebekino implementedin 2018 In 2018, ZAVKOM-ENGINEERING LLC completed work on the development of individual sections of the design documentation for the construction of the facility: "Industrial facility for the production of synthetic resins on the land plot of ALNEX-BELGOROD LLC, Shebekino. To get a consultation
✓ 2018 Crystallization Unit X-102 JSC “Gazpromneft-ONPZ” Omsk Region Crystallization Unit X-102 JSC “Gazpromneft-ONPZ” Omsk Region implementedin 2018 Scope of supply: Supply of equipment To get a consultation
▶ Implementation Project for obtaining technical naphthalene JSC «MMK» Magnitogorsk Project for obtaining technical naphthalene JSC «MMK» Magnitogorsk stageImplementation In 2018 ZAVKOM-ENGINEERING LLC completed work on the project for obtaining technical naphthalene with a concentration of at least 97% at Magnitogorsk Metallurgical Plant JSC (MMK JSC) in Magnitogorsk The naphthalene production process is fully automated; the most modern technological equipment from the world's leading suppliers has been supplied. As part of the project, our company performed the following types of work: Development of technology for producing naphthalene from naphthalene-containing fraction Development of design and working documentation; Complete delivery of technological equipment: unit for rectification of naphthalene; alcohol storage; storage warehouse; installation for obtaining flaked naphthalene; Installation supervision; Start-up and adjustment works; Personnel training. To get a consultation
✓ 2017 Supply of equipment for the production of resins LLC «Metadynea» Orekhovo-Zuevo Supply of equipment for the production of resins LLC «Metadynea» Orekhovo-Zuevo implementedin 2017 In 2017, ZAVKOM-ENGINEERING LLC completed work on the supply of equipment to Metadynea LLC in the town of Orekhovo-Zuevo. As part of the project to expand the production of formaldehyde resins, our company has designed and supplied reactor, capacitive and heat exchange equipment. To get a consultation
✓ 2017 Rectification and vacuum evaporation unit — supply and start-up «Geropharm» LLC Saint Petersburg Rectification and vacuum evaporation unit — supply and start-up «Geropharm» LLC Saint Petersburg implementedin 2017 LLC “ZAVKOM-ENGINEERING” implemented a rectification unit and a vacuum-evaporation unit for the production of pharmaceutical substrates at LLC “Geropharm” Scope of supply: Supply of equipment Installation and supervision works Author’s supervision To get a consultation
✓ 2017 Installation of increasing the capacity of cold production PJSC «Pigment» Tambov Installation of increasing the capacity of cold production PJSC «Pigment» Tambov implementedin 2017 The absorption refrigeration machine was put into commercial operation in 2017. The company 000 "ZAVKOM-ENGINEERING" in 2017 successfully carried out work on the implementation of the project "Technical re-equipment. Expansion of resin production. Stage 2. Increase in cold production capacity in workshop No. 32 "for PJSC" Pigment ", Tambov. Within the framework of this project, it has been implemented - design and working documentation has been developed, equipment has been completed, equipment has been supplied, installation supervision and commissioning work has been carried out with training of production personnel. To get a consultation
✓ 2016 Pilot vapor-phase catalytic units for the synthesis of divinyl from ethanol «ETB Kat» LLC (Skolkovo resident) Skolkovo Pilot vapor-phase catalytic units for the synthesis of divinyl from ethanol «ETB Kat» LLC (Skolkovo resident) Skolkovo implementedin 2016 In 2016, ZAVKOM-ENGINEERING LLC completed work on the construction of a pilot vapor-phase catalytic unit for the synthesis of divinyl from ethanol. During the implementation of the project, our company performed the following types of work: a conceptual diagram was developed equipment was calculated design and work-design documentation was developed key capacitive and reaction equipment was manufactured completing with auxiliary equipment and materials assembly at the production site and commissioning with the development of a pilot batch of products To get a consultation
✓ 2016 Pilot plant DSSK-4 PJSC «Sibur Holding» Voronezh Pilot plant DSSK-4 PJSC «Sibur Holding» Voronezh implementedin 2016 As part of the implementation of this project, design and working documentation has been developed. To get a consultation
✓ 2016 Unit was put into operation Installation of preparation of adhesive composition JSC «AFZ» Arkhangelsk Unit was put into operation Installation of preparation of adhesive composition JSC «AFZ» Arkhangelsk implementedin 2016 The unit was put into commercial operation in 2016. In 2016, the company ZAVKOM-ENGINEERING LLC successfully carried out work on the implementation of the project for the construction of an installation for the preparation of an adhesive composition for JSC Arkhangelsk Plywood Plant. To get a consultation
✓ 2016 Pilot vapor-phase catalytic plant «IFOTOP» LLC (Skolkovo resident) Skolkovo Pilot vapor-phase catalytic plant «IFOTOP» LLC (Skolkovo resident) Skolkovo implementedin 2016 In 2016, ZAVKOM-ENGINEERING LLC completed work on the construction of a pilot vapor-phase catalytic unit for the process of producing N-methyl-p-anisidine from p-anisidine (N-methyl-p-phenetidine from p-phenetidine) and methanol. During the implementation of the project, our company performed the following types of work: a conceptual diagram was developed equipment was calculated design and work-design documentation was developed key capacitive and reaction equipment was manufactured completing with auxiliary equipment and materials assembly at the production site and commissioning with the development of a pilot batch of products To get a consultation
✓ 2016 Rectification and vacuum evaporation unit — development of detailed design documentation LLC “Geropharm” Saint Petersburg Rectification and vacuum evaporation unit — development of detailed design documentation LLC “Geropharm” Saint Petersburg implementedin 2016 Scope of supply: Development of individual sections of working documentation Development of design documentation To get a consultation
✓ 2015 Installation of resin production (MPST) LLC «Schattdecor» Tyumen Installation of resin production (MPST) LLC «Schattdecor» Tyumen implementedin 2015 The unit was put into commercial operation in 2015. In 2015, ZAVKOM-ENGINEERING LLC successfully completed the construction project for the production of urea-formaldehyde resin (PKFT) and melamine-formaldehyde resin (MPST) with a total capacity of 20,000 tons / year. Within the framework of this project, the project has been implemented — the design and working documentation has been developed, the equipment has been completed, the equipment has been manufactured and supplied, installation supervision and commissioning have been carried out. To get a consultation
✓ 2015 Production of UFC and resins LLC «PDK Apsheronsk» Apsheronsk Production of UFC and resins LLC «PDK Apsheronsk» Apsheronsk implementedin 2015 In 2015, ZAVKOM-ENGINEERING LLC completed the design of the UFC-85 production facility with a capacity of 40,000 tons / year and urea-formaldehyde resins with a capacity of 58,000 tons / year for OOO PDK Apsheronsk, Apsheronsk Within the framework of this project, it has been implemented — design and working documentation has been developed (the project has passed the state examination), complete set, manufacture and delivery of equipment for warehouses for storage of raw materials and finished products (storage warehouse for methanol, resins and UFC). To get a consultation
✓ 2014 Benzene purification technology Zarya Scientific and Production Enterprise LLC Benzene purification technology Zarya Scientific and Production Enterprise LLC implementedin 2014 In 2014, ZAVKOM-ENGINEERING LLC carried out work on the modernization of the crude benzene purification technology for SPE Zarya LLC. Within the framework of this project, the collection of initial data was carried out and engineering documentation was developed for the modernization of the existing production with an improvement in the quality indicators of the products. To get a consultation
✓ 2014 Project of the production of urea-formaldehyde resins CJSC «Murom» Murom Project of the production of urea-formaldehyde resins CJSC «Murom» Murom implementedin 2014 In 2014, ZAVKOM-ENGINEERING LLC successfully completed work on the development of design and working documentation for the production of urea-formaldehyde resins with a capacity of 50,000 tons / year at CJSC "Murom". Storage warehouse UFC-85 and 37% formalin for CJSC "Murom". The warehouse was put into operation in 2018. In 2018, the company 000 ZAVKOM-ENGINEERING implemented a project for the technical re-equipment of a raw material warehouse for ZAO Murom in Murom. Within the framework of this project, the design and working documentation was developed (the project passed the industrial safety examination), the equipment was completed, manufactured and supplied, the installation supervision and commissioning of the storage warehouse for UFC and formalin were carried out. To get a consultation
✓ 2014 Installation of preparation of adhesive composition CJSC «Murom» Murom Installation of preparation of adhesive composition CJSC «Murom» Murom implementedin 2014 The unit was put into commercial operation in 2014. In 2014, ZAVKOM-ENGINEERING LLC completed work on the construction of an adhesive preparation plant for Murom CJSC, Murom. To get a consultation
▶ Implementation Project for the supply of glue preparation sections LLC «Synergy» Verkhnyaya Tura Project for the supply of glue preparation sections LLC «Synergy» Verkhnyaya Tura stageImplementation The company ZAVKOM-ENGINEERING LLC is currently carrying out work on the implementation of the project for the supply of glue preparation sections based on SFZh-3014 resin with a capacity of 12,480 tons / year (up to 37.82 tons / day) and urea-formaldehyde resin with a capacity of 2000 tons / year (up to 6 , 06 tons / day), resin warehouse and bulk components warehouse at Synergy LLC in Verkhnyaya Tura, Sverdlovsk region. The process of obtaining the adhesive composition is fully automated and practically does not require human intervention; the supply of the most modern technological equipment from the world's leading suppliers is envisaged. As part of the project, our company performs the following types of work: Development of working documentation; Complete delivery of equipment: glue installation of urea-formaldehyde glue; glue installation of phenol-formaldehyde glue; resin warehouse; warehouse of bulk components; auxiliary equipment. Installation supervision; Start-up and adjustment works; Personnel training. To get a consultation