Implementation Heat-exchange equipment for a mash-rectification unit Spirt Bal Buram LLC Mongolia Heat-exchange equipment for a mash-rectification unit Spirt Bal Buram LLC Mongolia Implementation Scope of supply:Manufacture and supply of equipment To get a consultation
Implementation Epuration column with heat-exchange equipment for a distillery JSC «Ganja Sharab-2» Azerbaijan Epuration column with heat-exchange equipment for a distillery JSC «Ganja Sharab-2» Azerbaijan Implementation Scope of supply:Manufacture and supply of equipment Project resultsThe supplied equipment completed the modernization of the mash-rectification unit and improved product quality. To get a consultation
Implementation Equipment package for fermentation and brewhouse departments LLC «Staraya Krepost» Belgorod Region Equipment package for fermentation and brewhouse departments LLC «Staraya Krepost» Belgorod Region Implementation Scope of supply:Brewing department expansion designComplete process equipment package for the fermentation departmentDeployment of Zavkom Control softwareInstallation, supervision and commissioning To get a consultation
Implementation Rectification Column with a Set of Heat Exchangers Ganja-Sharab-2 OJSC Azerbaijan Rectification Column with a Set of Heat Exchangers Ganja-Sharab-2 OJSC Azerbaijan Implementation The project involved the supply of a rectification column and a set of heat exchange equipment for a distillation unit with a capacity of 4,000 dal per day. Scope of supply: Development of process engineering documentation Manufacturing and supply of process equipment: Rectification column Reboiler of the rectification column Block of dephlegmators Block of condensers To get a consultation
Completed Plant for the Production of Aromatic Alcohols with Two Alembic-Type Evaporation Units ALVIZ JSC Arkhangelsk Plant for the Production of Aromatic Alcohols with Two Alembic-Type Evaporation Units ALVIZ JSC Arkhangelsk Completed On January 22, 2020, ALVIZ JSC together with ZAVKOM-ENGINEERING LLC successfully commissioned a plant for the production of aromatic alcohols (alembic). Scope of supply: Design, manufacturing, and supply of the alembic complete with control cabinet and shut-off and control valves Development of software Supervisory installation and commissioning works Project implementation results: The successful commissioning of the plant made it possible to provide the ALVIZ distillery with the required amount of aromatic alcohols and improve the quality of the produced products. To get a consultation
Implementation Usadsky distillery plant «Tatspirtprom» JSC City of Usady Usadsky distillery plant «Tatspirtprom» JSC City of Usady Implementation In 2015, ZAVKOM-ENGINEERING LLC launched the Usadsky distillery with a capacity of 10,000 deciliters of alcohol per day, located in the city of Usady, the Republic of Tatarstan. In this project, Zavkom Engineering LLC participated as a General Designer, as well as a supplier of process equipment for the following areas: water-heat treatment of raw materials, yeast-fermentation department, CIP station, alcohol storage. As part of the project, our company performed the following types of work: General design of the facility (development of design and working documentation); Complete supply of technological equipment; Installation works; Commissioning works; Staff training. To get a consultation
Modernization of a distillation plant for one of the largest distillery producers in Azerbaijan 30.01.2025