ZNAMENSKY SUGAR PLANT

LLC «Rusagro-Tambov»
Tambov Region

In 2020, ZAVKOM-ENGINEERING LLC  carried out a technical re-equipment of the sulfuric acid storage warehouse in order to organize a site for the preparation and dosing of 30% sulfuric acid into the decalcified molasses pipeline of the desugarization production unit and the extract pipeline.

The production process is fully automated; the most modern technological equipment from leading Russian and world manufacturers has been supplied.

As part of the project, our company performed the following types of work:

  1. Development of design and working documentation.
  2. Development of a plan for the localization and elimination of the consequences of accidents (PMLA).
  3. Development of technological regulations.
  4. Complete delivery of technological Equipment.
  5. Development of automated process control systems.
  6. Installation work.
  7. Commissioning.
  8. Personnel training.
  9. Putting into operation.
  10. Registration of the Object in Rostekhnadzor (Federal Environmental, Industrial and Nuclear Supervision Service).