In 2018, ZAVKOM-ENGINEERING LLC completed for Tatneft PJSC the Basic design of a process plant for the production of denatured bioethanol with a capacity of 25,000 tons per year.
In 2018, ZAVKOM-ENGINEERING LLC completed for Tatneft PJSC the Basic design of a process plant for the production of denatured bioethanol with a capacity of 25,000 tons per year.