Mini-refinery calculator

MINI-refinery cost and timing calculator

Specify key parameters to get a preliminary estimate of the cost and time frame for the project.

Calculation base according to

100 000

Raw materials

0
0
0

Performance and climate


Delivery and work boundaries


Additional options

  • Estimated cost: from 250 million ₽ Formula: Basic cost × Coefficients of raw materials, execution, climate and services
  • Production time: from 6 months Formula: Basic term (6-18 months) + Additional. work (installation, commissioning, training)
  • Recommended stage: Budget estimate Formula: Depends on performance (the more, the more serious the stage)
* The estimate is preliminary.
Output of finished products
— Formula: Productivity × Product Yield Ratio. When selecting several products, the coefficients are summed up
Payback period: — Formula: Project Cost ÷ (Product Output × Product Price) years
* The calculation is based on industry-average indicators. Exact figures are determined after a detailed survey.