Forfas department calculator

Brewery façade separation calculator

Specify the volume of prefabricated parts, their quantity, installation conditions and equipment - the calculator will estimate the cost, revenue and payback period.

Basic parameters

200
4
1.5

Bottling lines

2

Equipment

  • Total volume of forfas: 800 hl V = Volume × Quantity
  • Estimated cost: ≈ 120 million ₽ Cost = V^0.65 × K_pressure × K_placement × K_equipment
* The estimate is preliminary.
Annual revenue
960 million ₽/year Revenue = Total volume × 100 l × 100 cycles × Price
Payback period: 2.5 years Payback = Cost / (Revenue − OPEX 65%)
*Calculation is based on industry averages.