Reference list
№ |
Year |
Customer |
Scope of work |
---|---|---|---|
1 |
2013-2015 |
JSC «Jigulev beer plant», Russia |
Construction of beer plant. EPC contract. |
2 |
2012-2015 |
JSC «Plemzavod Yubileyni», Russia |
Construction of deep processing of grains complex: grain elevator, lysine production 15 Kt/y, citric acid - 20 Kt/y, feed additives - 40 Kt/y, gluten - 10 Kt/y. EPC contract. |
3 |
2012-2013 |
JSC «East Alliance», Vietnam |
Construction of alcohol plant, 5 000 Kt/y. EPC contract. |
4 |
2012 |
Ltd. «Lus Asth», Armenia |
Construction of ethanol distillation unit. EPC contract. |
5 |
2011-2013 |
JSC «Tatspirtprom», Russia |
Construction of ethanol plant, 35000 Kt/y and DDGS unit. EPC contract |
6 |
2010-2013 |
Ltd. «Agroferment», Russia |
Construction of enzyme production plant 1000 t/y. EPC contact. |
7 |
2009-2010 |
JSC «Talvis», Russia |
Construction of CO2 reduction unit at 35000 Kt/y ethanol production plant. EPC contact. |
8 |
2009-2013 |
«Mihe» AG, Germany |
Construction of bio-ethanol plant and DDGS unit. EP contract. |
9 |
2009 |
Ltd. «Trehsosensky plant», Russia |
Construction of beer plant. EP contract. |
10 |
2009 |
JSC «Derbent Conyac plant», Russia |
Construction of alcohol plant. EPC contract. |
11 |
2008-2009 |
Ltd. «Kitiso», Russia |
Construction of DDGS unit. EPC contract. |
12 |
2008-now |
Ltd. «Titan-Agro», Russia |
Construction of ETBE, gluten, starch and DDGS units. EPC contract. |
13 |
2008-2009 |
JSC «DIGS Group», Russia |
Construction of Kvass production plant. EPC contract. |
14 |
2008-2009 |
JSC «Morshansky beer plant», Russia |
Construction of beer plant. EP contract. |
15 |
2008 |
JSC «Samara Wine Plant», Russia |
Construction of ethanol distillation unit. EPC contract. |
16 |
2008 |
Ltd. «Biokorm», Kazakhstan |
Construction of ethanol distillation unit. EPC contract. |
17 |
2008 |
Ltd. «Maximus», Kazakhstan |
Construction of ethanol distillation unit. EPC contract. |
18 |
2008 |
JSC «Tatspirtprom», Russia |
Construction of ethanol distillation unit. EPC contract. |
19 |
2008 |
JSC «SpirtBalBuram», Mongolia |
Construction of alcohol plant. EPC contract. |
20 |
2007 |
JSC «Heer Adu», Mongolia |
Construction of ethanol plant. EPC contract. |
21 |
2007 |
JSC «Georgievskoe», Russia |
Construction of alcohol plant. EPC contract. |
22 |
2007 |
JSC «Penzaspirtprom», Russia |
Construction of ethanol distillation unit. EPC contract. |
23 |
2006 |
JSC «Veda», Russia |
Construction of alcohol plant. EPC contract. |
24 |
2006 |
Ltd. «Benat», Russia |
Construction of alcohol plant. EPC contract. |
25 |
2006 |
Ltd. «Mojeikovo», Belorussia |
Construction of ethanol distillation unit. EPC contract. |
26 |
2006 |
Ltd. «Orion and K», Moldova |
Construction of ethanol distillation unit. EPC contract. |
27 |
2005 |
Ltd. «Perm Alco», Russia |
Construction of alcohol plant. Basic and detailed engineering contract. |
28 |
2005 |
Ltd. «Lus Asth», Armenia |
Construction of ethanol plant. EPC contract. |
29 |
2005 |
Ltd. «Russian Standard Vodka», Russia |
Construction of alcohol plant. EPC contract. |
30 |
2004-2007 |
Roslysine Netherlands B.V., Russian branch |
Construction of animal feed amino acids. EPC contract. |
Date |
Project |
Scope of performed works |
Equipment name |
Quantity, pcs |
---|---|---|---|---|
2008 |
Expansion of production of sulfuric acid of «PG «Phosphorit» Ltd. as per the «SNC – Lavalin Engineers & Constructor» project |
Delivery of non-assembled apparatuses, supervision of final assembly |
Contact apparatus of oxidation of sulfur dioxide into sulfur trioxide (m=340 000 kg, material-AISI 304) |
1 piece |
2008 |
Expansion of production of JSC «Sibur PETF» |
Delivery of a non-assembled apparatus with the following final assembly |
Bunker V=1200m3 for storage of terephthalic acid (AMGZ) |
1 piece |
2009 |
Expansion of production of sulfuric acid of «PG «Phosphorit» Ltd. as per the «SNC – Lavalin Engineers & Constructor» project |
Delivery of apparatuses as assembly units with the following final assembly |
Sulfuric furnace body as a unit of gas waste (Steel-09Г2С, Ø5500mm, m=75 000kg) |
1 шт. |
2009 |
Reconstruction of production of styrene of CJSC «Sibur-Khimprom» |
Delivery of apparatuses as assembly units with the following final assembly |
Foam apparatuspos. А-209 (Steel–09Г2С, Ø6000mm, m=72000kg) |
1 piece |
2011 |
Gas-fieldconstructioninN.Urengoy |
Delivery of an apparatus with the following installation of nozzles on site |
Vessel V=200m3 (Steel09Г2С; V=200m3; m=104 000kg) |
6 pcs |
2011 |
Reconstruction of production of JSC «Ufaneftekhim» |
Delivery of apparatuses as assembly units, supervision of final assembly |
Depentanizer К-601 (Steel 09Г2С; Ø3200mm, m=200000kg) |
1 piece |
2012 |
Construction of accompanying gas treatment installations on sites of JSC «SiburTyumenGaz» |
Delivery of apparatuses as assembly units, supervision of final assembly |
Demethanizer К-1 (Steel 12Х18Н10Т; m=58 000 kg) DemethanizerС-1 (Steel12Х18Н10Т; m=75 000 kg) |
1 piece 1 piece |
2012 |
Reconstruction of JSC «Khabarovsk Refinery» |
Delivery of apparatuses as assembly units, supervision of final assembly |
Deisopentanizer К-301 (Steel 09Г2С; Ø3200mm, m=79000 kg) |
1 piece |
2012 |
Building of production of TEP ТЭП-50 of «Voronezhsyntezkauchuk» |
Delivery of apparatuses as assembly units with the following final assembly |
Vessel MS-214 (Steel 09Г2С, Ø6500 mm, m=56 000kg) |
4 pcs |
2012 |
Reconstruction of ethylene production of JSC «Sibur-Neftekhim» |
Delivery of a non-assembled apparatus with the following final assembly |
Quenching water column К-210 (Steel 09Г2С, Ø7250mm, m=135000kg) |
1 piece |
2012 |
Reconstruction of sulfuric acid production of CJSC «Ryazan Oil-Processing Company» |
Disassembly of old equipment, delivery of apparatuses as assembly units with the following final assembly, piping of apparatuses, heat insulation and commissioning |
Contact apparatus КА-1, КА-2 (Steel 12Х18Н10Т, Ø6000 mm, m=78 100 kg) |
2 pcs |
2012 |
Building of Novourengoy gas and chemical complex |
Delivery of an apparatus with the following installation of nozzles on site |
Propane vessel V=200m3 (Steel 09Г2С; Ø4200mm, m=95 000 kg) |
4 pcs |
2012, 2013 |
Building of complex for transshipment of SGK «NOVATEK – Ust-Luga » Ltd. |
Delivery of apparatuses as assembly units with the following final assembly and packaging arrangement by mass exchange units, stop valves and instrumentation |
Column К-101, 201 (Steel09Г2С; Ø4000mm, m=95 000 kg) ColumnК-102, 202 (Steel 09Г2С; Ø4500mm, m=130000kg) Column К-103/104, 203/204 (Steel 09Г2С; Ø1800mm, m=35 000 kg) Column К-105, 205 (Steel 09Г2С; Ø2600mm, m= 73 000kg) |
2 pcs 2 pcs 2 pcs 2 pcs |
2012 |
Construction of hydrogen plant for refineries of NK Bashneft |
Manufacture and delivery of completely assembled apparatuses |
Adsorber КЦА М-001 (Steel 09Г2С, Ø3700mm, m=43 t) Adsorber КЦА М-002 (Steel 09Г2С, Ø3200mm, m=34 t) ResidualgasvesselМ-001 (Steel 09Г2С, Ø4000mm, m=74 t) Residual gas vessel М-002 (Steel 09Г2С, Ø4000mm, m=60 t) |
12 pcs 6 pcs 2 pcs 1 pcs |
2012-2013 |
Building of CJSC «Plant of Premixes No.1 » |
Delivery of non-assembled apparatuses with the following final assembly |
Fermenter (Steel 304L, 316L; Ø6250mm, m= 140 000 kg) |
6 pcs |
Manufacture and delivery of completely assembled apparatuses |
Lysine storage vessel (Steel 304L; Ø5300mm, m= 60 000 kg, V=417 m3) Sterile environment vessel(Steel 304L; Ø5000mm, m= 55 000 kg, V=323 m3) |
9 pcs 3 pcs |
||
2013 |
Reconstruction of ethylene oxide production of JSC «Sibur-Neftekhim» |
Delivery of non-assembled apparatuses with the following final assembly |
Column of purification of CG from СО2 (Steel 09Г2С/12Х18Н10Т, Ø3300mm, m=174500kg) |
2 pcs |
2012-2014 |
Building of ELOY-AT-Z, hydrofining installations, delayed coking installations of CJSC «Antipinsky Refinery» |
Delivery of non-assembled apparatuses with the following final assembly |
Column 202С002 (Steel 516Gr.70, 516Gr.70+321; m=200 000 kg, Ø5200 mm) Column 204С201 (516Gr.70+321; m=120 000 kg, Ø3800 mm) Вакуумная колонна 301С001 (516Gr.70, 516Gr.70+410S; m=340 000 kg, Ø7000/9700/4100 mm) Column 302С001 (516Gr.70, 516Gr.70+410S; m=125 000 kg, Ø3300) Column 302С003 (516Gr.70; m=100 000 kg, Ø4500) |
1 piece 1 piece 1 piece 1 piece 1 piece |
2013 |
Expansion of production of rectification of JSC «Kuibyshev Azot» |
Delivery of a non-assembled apparatus with the following final assembly |
Column К-387 (Сталь 09Г2С, Ø5200mm, m=195150kg) |
1 piece |
2013 |
Reconstruction of production of JSC «Tobolsk-Neftekhim» |
Delivery of a non-assembled apparatus with the following final assembly |
Column К-1 (Steel 09Г2С, Ø4500mm, m=170500kg) |
1 piece |
2013 |
Reconstruction of «Lukoil-PNGP» Ltd. |
Delivery of apparatuses as assembly units, supervision of final assembly |
Column С-1 (Steel 12Х18Н10Т, m=29 000 kg) Column С-2 (Steel 12Х18Н10Т, m=52 000 kg) Column С-3 (Steel 09Г2С, m=100 000 kg) |
1 piece 1 piece 1 piece |